CASE STUDY: Loughborough High School Building 2009
|
|
Location
| |
Loughborough Leicestershire
| |
 |
|
|
Duration
| |
1 Week
| |
|
|
Client
| |
Loughborough Endowed Schools
| |
|
|
Scope of Works
| |
Installation of:
Ceiling mounted projectors
Desktop Mounted Back Box & AV Faceplate
Including VGA, USB & Composite Video Connections
30w desk mounted amplifier with volume control (mounted in a singlegang faceplate) including
2 switchable inputs that can be connected by either mini jack connections
40w mountable speakers including adjustable wall mounting brackets
Interactive Smartboards
Category 6 Computer Network Cabling
Fiber Optic & Telephone Backbone Cabling
| |
|
|
Project Focus
| |
|
Loughborough Endowed Schools required a new AV Installation within their new Science Building.
New Ceiling mounted Projectors were installed with Interactive Smartboards to enable Video to be
displayed from either the Projector or a PC connected directly to the Smartboard.
Audio within each classroom was achieved by installing a 30w desk mounted amplifier with
volume control (mounted in a singlegang faceplate) including 2 switchable inputs that can
be connected by either mini jack connections.
|
|
|
Speakers were discreetly installed either side of the Smartboard and connected to the desk
mounted amplifier which was presented within a smart angled desk mounted backbox.
This solution was chosen to eliminate excessive unsightly wiring hanging down walls, large
amplifiers & other equipment being bundled under desks.
In our opinion the whole installation takes on a very neat and tidy appearance our clients
find is ascetically pleasing and very easy to use.
In addition to the installation of AV equipment, we also installed a complete structured
cabling installation to provide network & telephone connectivity for up to 240 users.
| |
 |
|